2004-2006
Bridge works as subcontractor of ASTALDI SpA on the project Bypass Pitesti
2006-2010
Basarab Overpass Bucharest
Works on infrastructure and suprastructure at Basarab Overpass, as subcontractor of JV ASTALDI FCC.
2010-2011
Sarulesti Bridge
Infrastructure and suprastructure works on Bucharest-Constanta railway, as subcontractor of ASTALDI SpA
2011
Bridge 20 over The Danube Black Sea Channel at the Motorway Bucharest – Constanta (Segment Medgidia –Constanta) .
As a subcontractor of the JVASTA LDI –MAX BOGL
2012
Bridge 15 over the MURES RIVER, 720 m length, 12 fields
DEVA-ORASTIE BYPASS BRIDGE OVER THE RIVER MUREST km. 19+857, as subcontractor of STRABAG
2012
VIADUCT SACEL 680 m length, 12 fields
MOTORWAY ORASTIE – SIBIU LOT 4 km 65+965 – 8 2.070
VIADUCT SACEL km 71+034,82 – 7 1+714,82
2012-2013
Bridge 3; 14; 24; and 25: as subcontractor of STRABAG
MOTORWAY ORASTIE – SIBI U LOT 1 km 0+000 – 2 4.110
Bridge 3 km 1+240
MOTORWAY ORASTIE – SIBIU LOT 1 km 0+000 – 24.110
Bridge 14 km. 9+830
MOTORWAY ORASTIE – SIBIU LOT 1 km 0+000 – 24.110
Cassette bridge 24 km. 21+410
Cassette bridge 25 km.21+425
2014
Bridge 12, 14
Railway Micasasa-Coşlariu
2014-2015
Residence – Regau, Austria
2014-2016
Bridge 2, 6, 12, 13,14, 14A
Highway S8 Wisniewo – Mezenin, Poland
2017-2018
Tunnel Top- Down WBS 134 18, WBS 134 1C, WBS 134 1E, WBS 134 1F
The works performed were: supply and installation of temporary steel structure against the sheetpiles – 700 tons, and concrete works.
The manufacturing part was made together with our two partners PROINVEST SRL and DEVA STEEL CORPORATION SRL.
at Folio Line Project EPC Oslo S Project – Oslo, NORWAY
As a subcontractor of Societa ltaliana per Condotte d’Acqua S.p.A
2018
Bridge WD2, PE10, WD 29, WD 31, WD31a
Retention Point Staw 1, Staw 2, Z1,Z2,Z3,Z4,Z5,Z6,Z7,Z8,Z9,Z10,Z11,Z12
Highway S3 , POLAND
As a subcontractor of the SALINI IMPREGILO S.p.A. Italia
2019-2024
Works performed at infrastructure of buildings 5, 4, 3, 2 at the prefab area of Storstrøm Bridge Project, Vordingborg – Denmark, as a subcontractor of SBJV (ITINERA spa ITALY);
Works performed at ‘’Special Supporting Structure for foundation of central pylon 1C’’ Storstrøm Bridge Project, Vordingborg – Denmark, as a subcontractor of SBJV (ITINERA spa ITALY);
Concrete Works performed at New Hospital (Nyt OUH) in Odense – Denmark, as a subcontractor of OHPT (ITINERA spa ITALY).