01 / 01
+4 0726617990

BASARAB OVERPASS

BASARAB OVERPASS

Works on infrastructure and suprastructure at Basarab Overpass, as subcontractor of JV ASTALDI FCC.
The main viaduct in AX A is 1.458,7 m lenght
The main viaduct in AX B is 1.441,35 m lenght
Access ramps 1.195 m lenght
Connections with the viaducts 1.126 m lenght

Our works

at BASARAB OVERPASS:
- 13.677,9 mc of concrete and 1.626,7 to of steel in 63 fondations
- 4.419,5 mc of concrete and 343,5 to of steel in 102 elevations
- 19.849,52 mc of concrete and 3.021,82 to of steel in 88 fields of cast on site decks and ramps with a total lenght 2.953,75 m.

Continuarea navigarii pe acest site se considera acceptare a politicii de utilizare a cookies si a politicii de prelucrare a datelor personale.